Our experts and engineers have 23 several years of Experience in the Bearing Industry. The large specific CNC equipment, this kind of as Sluggish-feeding wire-cut device, jig grinding device and electric discharge device, guarantees the best good quality precision of mould processing, with the substantial successful and environmental defense acid rolling line currently being the greatest raw content converting equipment in the area in china The wildly use of automatic milling equipment, large-pace automated feeding punch, large velocity automated rolling and assembling machine assures the large quality and performance of elements and chain making. EPG has been effectively qualified by ISO9002 High quality Administration Technique, ISO9001 Good quality Management Technique, API certificate, ISO/TS16949:2002 and ISO10012 measurement management system. Mask Ear Cord Braiding EPTT
kind | 6G | 16G | 24G | 24G | remark |
diameter | 3mm | four-5mm | 5-7mm | 5-7mm | |
pace | 1800 | 1800 | 1800 | 3000 | |
EPTT | .55KW | .55KW | .55KW | .55KW | |
Speed regulating motor | 90V | 90V | 90V | 90V | |
Package measurement | 3300*1300*1900mm | 30heads | |||
2300*1300*1900mm | 20heads | ||||
WeigEPTT | 350kgs | 30heads | |||
300kgs | 20heads |
The EPT motor of PGF hi-pace knitting EPTT is used with the strategy of frequency conversion, which allows the stepless speed manage even in the course of the operation, for case in point: even though the feeding breaks (finishes), the EPTT is routinely stopped although the vehicle feeding gadget is used for knitting main fabirc, for both thick or thin main content within the restrict, the shipping and delivery is uniform the EPTT is also stopped instantly even though core breaking(finishing) to steer clear of degrated merchandise. And the braided cloth that is created with PGF hi-speed knitting EPTT is of higher qualify and more reputable.
II, Purposes AND Materials OF KNITTING
PGF hello-speed knitting EPTT is capable to knit curtain belt, shoe belt, cummerbund of the shapes of column, pipe, and flat, and pipe-condition jacket, and so on.
Numerous kinds of material are adoptable for PGF hello-speed knitting EPTT, these kinds of as cotton yarn, chemical fibre yarn, silk, delicate steel wire, and so on.
III, Attributes
PGF hello-speed knitting EPTT is of the close composition, hassle-free for procedure, hugely automatic, swift for adjustment, reputable for procedure, of decrease sounds, of larger effectiveness, of EPT top quality and so on.
IV, Operation Methods
Prior to starting the EPTT, shall examine the subsequent objects:
1 regardless of whether the EPTT strain is proper
2 whether the earth gadget is dependable
3 whether or not the motor steering is appropriate
4 thoroughly clean up the desk, and other obstructions that influence the operation of the EPTT
five whether or not the EPTT oil is experienced (oil design, oil quantity)
After the earlier mentioned things are checked and handed, stick to up the below techniques to begin the EPTT:
1 link the EPTT (EPTT two stage 380v)
two move the change of EPT box to the point of quotON quot(the EPTT source indicator is on, which indicates it is EPTTed)
3 push the begin button
four change the rotating-set up button clockwise
5 refer to the handbook of frequency conversion EPTT to operation the EPTT.
V, Remedy FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) although the EPTT is doing work, the breaking indicator is on. Check every yarn cop. If the yarn is damaged, pull the finish of that yarn in direction of the concluded knitting, and then push the startup button if the yarn cop is empty, just take off that a single, and replace it and thread the yarn and pull the end of yarn in direction of the completed knitting, and then press the startup button. If the main is broken, check the core unEPTTthe EPTT physique, and pull the stop of the core towards the finished a single, and then push the button to knit.
VI, ADJUSTMENT OF Sure Velocity
To change the speed of the top still left EPT on the cEPTTr column can obtain distinct velocity of sure, and different sheer-condition cross details of every single duration in mm (or named as merchandise density, item no.)
Refer to the under chart and table one for information
DIAGRAM OF Gear
Contrast table among the certain speed of hello-pace knitting EPTT and EPT EPTTble 1
(from the remaining to the correct)
Frequency of motor: 60HzZB=30ZC=28
ZA speed of bound CM/min variety of sheer-shape cross position/CM
Frequency of motor: 60HzZB=30ZC=36
ZA velocity of certain CM/min variety of sheer-condition cross position/CM
Frequency of motor: 60HzZB=30ZC=38
ZA velocity of bound CM/min amount of sheer-form cross level/CM
Be aware: Whilst the frequency of motor is not 60HZ, the speed of sure is that the value in the over table times the actual perform frequency/sixty, and the sheer-condition cross position is not transformed.
VII, Maintenance INTRODUCTION
For the EPTT that is being employed, should lubricate its guide, spline ingot groove, and the lubrication quantity can not spill more than, and it is ideal to lubricate it just staying away from dry-operating. Have to incorporate oil on the concave ring of spline shaft, at lEPT two moments per eigEPTT hours, numerous drops per time.
The oil that is mostly used on the spline EPT box must be changed entirely following 1 month, and then, is to be supplemEPTTd in accordance to oil scale amount. During the creation, choose whether to exchange lubrication (the lubrication used on the EPTT is 32#) in accordance to the oil position. Shall thoroughly clean up the float on any areas often (do not do it whilst the EPTT is operating).
VIII, Safeguards for Set up and Assembly amp Unassembled
Installation: have to put the EPTT on the rigid ground, and need to preserve it in amount following whilst installing the rear desk board.
Hanging Set up: if this EPTT is moved right after dis-packaged, regardless of whether for forklift or crane, the position of power shall alwaEPTTbe set on the reduce crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, should not on the table board of the knitting EPTT.
EPTTAL Component
Hi-speed sealing knitting EPTT | Operation guide | Total 11 pages | ||||||||||||||||||||||||||||||
Website page 6 | ||||||||||||||||||||||||||||||||
7.2 typical faults and remedy approaches for frequency conversion EPTT in beneath desk
|
Hi-speed sealing knitting EPTT | Procedure guide | Overall eleven internet pages | |||||||||||||||||||||||||||||||||
Web page seven | |||||||||||||||||||||||||||||||||||
continued
|
Hi-pace sealing knitting EPTT | Procedure guide | Total 11 webpages |
Webpage 8 | ||
VIII, Important purpose, function display, procedure introduction of HLPC 0D7523A EPTT operation EPTT 8.one essential perform of HLPC 0D7523A EPTT procedure EPTT 1 PROG programming/operate exhibit important |
Hi-pace sealing knitting EPTT | Operation handbook | Total 11 web pages |
Webpage nine | ||
eight.2 Clarification of purpose display things
|
Hello-pace sealing knitting EPTT | Operation manual | Overall 11 web pages |
Page ten | ||
eight.3 Clarification of keyboard
EPTT on #8594 display F00.(press PROG) #8594display FOR or REV (press PROG) #8594 current C000 (the operate code variety interface can make use of #9661 #9651keEPTTto modify the flash digit variety, the last digit flashes) #8594 (push EPTTR) existing C000 (The first digit flashes) #8594 (push EPTTR) existing C000 (The initial digit flashes) #8594 (push EPTTR) present C000, the previous digit flashes. Example: c111 is established as two, as following
|
Hi-pace sealing knitting EPTT | Procedure manual | Overall eleven pages |
Webpage eleven | ||
VIII, EPT Diagram (see attachment)
VV, Thorough EXPLAINATION OF FREQUENCY CONVERSION EPTT |
I. EPTT Introduction The large-speed braiding EPTT uses a sort of EPTT and novel style. 4 sixteen-spindle braiding EPTTs are integrated into one particular unity. By using the VFD-A sort alternating present motor EPTr that is made through combining the pc handle EPT, the centralized frequency-modify and stepless velocity regulation can be recognized. The EPTT is presented with many types of automatic protective capabilities these kinds of as: computerized stop whilst the line breaks, above torque, more than voltage, unEPTTvoltage, overheating, above load and so on. The EPTT also has different outstXiHu (West EPT) Dis.Hu (West EPT) Dis. benefits, for case in point: high rotate pace, large production performance, little flooring spot, low noise, EPTT services life and effortless operation as effectively as vitality preserving. It is the upgrading and new era solution of classic disc braiding EPTT. II. Fundamental EPTnical Parameters Rated EPTT of motor: 075W Rated velocity of motor: 1390r/min Amount of spindle: 16*four 960*790*seven-hundred(L*B*H) 24*two 1240*620*700(L*B*H) Specification of quill:( Phi48*one hundred sixty)mm Spindle pace: 350r/min Technique of pace adjustment: frequency-modify and stepless pace regulation III. Services Conditions Voltage of EPTT source: AC220V plusmn10%HUO or AC380V plusmn10% Frequency of EPTT supply: 50HZ plusmn5% Ambient temperature: -ten ordmC-40 ordmC(no condensation and no freeze) Ambient humidity: unEPTT90%RH(no condensation) Operating surroundings: no h2o droplets, steam, dust and grease stain no putridity, flammable gasoline and liquid no drifting dust and steel particle strong foundation, no serious vibration no interruption of electromagnetic sound. IV. Set up 4.1The gear fixture base are not required for the set up of this EPTT. Only place the EPTT on the solid and even concrete floor and keep stage without vibration. 4.two Configuration of EPTT EPT four.2.one According to the consumer need, the EPTT may possibly supply higher velocity braiding EPTTs that are used to two sorts of voltage ranges: 220V, 50HZ and 380V, 50HZ. The user shall join lines properly according to the pertinent voltage level of bought products. Be certain no mistaken relationship so as to keep away from that the EPTT can not operate generally or any damage takes place. 4.two.two When person disposes the EPTT offer of high pace braiding EPTT, you should EPTTly care regardless of whether there is a reliable floor line in the electrical power grid (SV220VAC380V)method (i.e. No matter whether there is trustworthy grounding for socket grounded stage of EPTT provide AC220V or AV380V). If not, an added protective ground line for the EPTT need to be made. Its base resistance shall not be above four Omega. And then merge it into the grounded phase of EPTT socket (SV220V or AC380V) or inducted to the grounding finish of the EPTT immediately. |
four.two.3 The EPTT line link of the EPTT is currently completed for users. The grounded phase of EPTT source plug is rightly related with grounding finish of the EPTT. The consumer just requirements to insert the EPTT offer plug into the EPTT source socket that is well prepared in accordance to pertinent voltage degree to link the existing. 4.3 In the scenario of not connecting the existing, open the doorway of EPT handle box with the offered key to verify regardless of whether electrical factors in EPT manage box are destroyed or loosening. If the connecting line is loosening, relevant steps must be done in time. five.one No-load Test five.1.1 Switch on the EPTT source of EPT handle box five.1.2 Turn on the swap of EPTT supply within the EPT manage box. If the indicating lamp of EPTT provide on the control panel and appropriate indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that every little thing is rigEPTT and no-load take a look at can be operated. five.one.3 Flip the speed-regulating potentiometer of frequency setting knob on the EPT manage box panel again to the scale 50(anti-clockwise rotation). Instantaneously press the button to make the EPTT to rotate instantaneously and observe regardless of whether it is rotating clockwise or not. If not, trade the positions of U and V of output port of frequency changer. View and make sure that the all managing is fleXiHu (West EPT) Dis.ble and smooth to make certain no road blocks and irregular clash. If some thing improper happens, pertinent reasons ought to be identified in orEPTTto remedy the dilemma. 5.1.four Push the startup button on handle panel, then steadily increase the managing strain of alternating motor EPTr (i.e. little by little rotate the potentiometer knob clockwise) at the very same time, look at and guarantee that the speeds of motor and rotation board are escalating gradually and that the operating is normal. five.1.5 Push the cease button on management panel and watch regardless of whether the motor is synchronized with the instruction. If not, the reason shall be found in orEPTTto remove the fault. 5.2 Load Take a look at five.two.one Right after no-load check is completed, the load examination can be operated. Area the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the required specified quill with the needed coloration yarn in accordance to the fancy yarns that will be weaved and get almost everything ready. five.two.two Switch the speed-regulating potentiometer knob on the EPT manage box panel back again to the scale , instantaneously press the button to switch on motor and make it rotate. Observe that the operating of quill has impediment or clash. If some thing wrong transpires, the cause shall be found in orEPTTto get rid of the fault. 5.two.3 Press the startup button and switch the pace-regulating potentiometer knob. Make the motor to maintain managing for a while(5~10min)in the pace of 1000r/min. If almost everything is right, minimize off 1 yarn by manual. If the motor is turned off at as soon as, it is proved that automatic quit protecting system is sensitive. So, the EPTT check is concluded totally. The EPTT can be put into the normal manufacturing. VI. Certain Notices In orEPTTto ensure the securities of men and women and equipment and obtain the best provider result, we would like to specifically rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of customers that subsequent situations must be paid out much more attentions although putting in this EPTT. |
6.one The workshop with the installation of this EPTT must have excellent floor wire with ground resistance of considerably less than 4
six.two This EPTT ought to be grounded independently it shall not be jointly grounded with higher electric powered-present EPTTs, these kinds of as electrical welding EPTT and substantial-EPTT electric motor. The EPTal area of floor line ought to be equal or much more than 4mm2.
six.4 When frequency changer outputting, in output side major circuit, alternating present getting in touch with spot is not permitted offering and breaking EPTT provide. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
EPT-speed Braiding EPTT | Instruction | Whole webpages | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
No. Webpage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|